Tanks Storage & Monitoring Integrated Control Safety System
HTS were responsible for the initial LOPA’s, Lifecycle Functional Safety Engineering to 61511, hardware & hardware engineering and design for […]
HTS were responsible for the initial LOPA’s, Lifecycle Functional Safety Engineering to 61511, hardware & hardware engineering and design for […]
Once the new bund was complete, the existing sulphuric acid tank was installed on the new plinth. Suitable pipework installed […]
Objectives Pump enclosure for two prominent dosing pumps complete with one suction and one discharge manifold complete with power distribution […]
Objectives Review and approval of customer design documentation Loop, DSD, Schematics in line with: ATEX Directive 2014/34/EU BS EN 60079-0:2018, […]
Objectives and Deliverables Full Panel build to INOVYN schematics Interpretation of customer hand drawn sketches to full G.A layout drawings […]
Objectives and Deliverables Include control and interface for existing Penstock Valves Display Level differential on new screen Replace and upgrade […]
Objectives and Deliverables Plastic enclosure Able to operate up to 10 peristaltic pumps Programmable Timer required 10 minute -60 minute […]
Objectives and Deliverables • DSD cals for the control panels loops • Loop drawings • Purchase of components as per […]
Objectives and Deliverables FOX controls required a build only package and point to point FAT Process and Conclusions Following on […]
Objectives and Deliverables FOX controls required a build only package. HTS Group can keep costs low by allowing engagement with […]
Objectives and Deliverables HTS was engaged to design, build, install, and commission. The scope of work included application programming and […]