Objectives and Deliverables • HTS Engineering Group was to carry out modifications to duct 5 plough to minimise the product […]

Objectives and Deliverables • HTS Engineering Group was to carry out modifications to duct 5 plough to minimise the product […]
Deliverables and Objectives: Automatic safety changeover of primary motor / pump failure to standby system. Periodic automatic weekly changeover between […]
Deliverables and Objectives: Non-contact measuring instrumentation Conversion from level to tonnage of resin Local Junction box with level display High […]
Objective and Deliverables Schematic review and G.A drawings Control panel materials selection Software and front panel analogue control Heat calculations […]
Objectives Engineering and design for the integration of the existing 32 electrical motors for pumps, agitators, etc. this will incorporate […]
Arvia, based in Runcorn, are a water treatment design and build house specialising in Tertiary Water treatment technology
HTS Group was appointed as project management for the installation of a new Ammonia Gas distribution and storage facility for a site located in NW England.
The tie-in facilities are to consist of a 30” x 10” tee inserted in the existing SIRGE pipeline, a double isolation valve arrangement to allow connection and tie-in to a new crossover pipeline between the EOSPS and the SIRGE pipelines, and a 10” future tie-in connection.