Objectives
Engineering and design for the integration of the existing 32 electrical motors for pumps, agitators, etc. this will incorporate any existing field start / stop control circuits for pumps:
Specification, Engineering and design for the existing and new process instrumentation and monitoring:
New Switch room specification, design, and build (GRP off-site build) for a new 630amp MCC and integrated control & Safety system.
New field installation for Exia and ExE/D equipment located in potentially explosive area for Gas.
Tie-into existing field equipment via new Junction boxes and rerouting of field cables.