Atex Skid Control Panel
Objectives and Deliverables • DSD cals for the control panels loops • Loop drawings • Purchase of components as per […]

Objectives and Deliverables • DSD cals for the control panels loops • Loop drawings • Purchase of components as per […]
The tie-in facilities are to consist of a 30” x 10” tee inserted in the existing SIRGE pipeline, a double isolation valve arrangement to allow connection and tie-in to a new crossover pipeline between the EOSPS and the SIRGE pipelines, and a 10” future tie-in connection.