PES: Pipeline System Project

Project Summary:

HTS Group was appointed as project management for a SIRGE Pipeline construction project in Scotland. HTS was responsible for all project management duties including, engineering & design, construction, installation and testing. This was a detailed project from design to full installation and testing, that was subject to tight time restriants as work had to be finshed during a shutdown period.

Key Facts

  • Division: Project Engineering Solutions
  • Industry: Chemicals & Manufacturing
  • Completion Date:19/06/2017

Conclusion

HTS completed all drawings and schedules needed to complete the relevant works, this included single line drawings, layouts and diagrams etc. Following this, HTS specified the correct gas detectors for the application needed to complete the full scope work, including detailed reports of each stage. The proactive approach taken with this project allowed HTS to work closely with the client and complete objectives according to schedule, ensuring minimum disruption to the client.

Related Projects

Tank Farms

Main Site Power Project

ATEX Inspections

Pipeline Project Management